Contact

Aviation Boulevard, HJAIA, International Terminal Entrance

(HJAIA) Atlanta, GA

Pond & Company prepared a roadway design for the main entrance to the new Maynard Jackson International Terminal at Hartsfield Jackson International Airport. The design included reconstruction of 0.8 miles of 4-lane roadway, with raised medians and urban shoulders, as well as parallel collector distributor roads. The design scope includes vertical and horizontal layouts, traffic studies, driveway profiles, drainage design, maintenance of traffic, erosion control, and right of way plans.

The phasing requirements were extremely complex to maintain existing utility service to adjacent facilities and traffic flow to the new International Terminal. This project has required extensive coordination between numerous stakeholders including FAA, GDOT, Delta, Clayton County, FHWA and Hartsfield Jackson Atlanta International Airport. The roadway has been designed to not only accommodate the future International Terminal traffic, but it will also serve the many airport facilities currently accessing the existing roadway.

The Boulevard is under construction and Pond is providing CEI services on the project.

 

Specifications

Size//0.8 Miles
Client//Hartsfield Jackson International Airport